Today the bulk of the work on our water line replacement was done. The plumbers dug a trench, laid a new water line, disconnected the old and connected the new. Then they turned the water on and checked for leaks.
New water line in trench. The new line is a plastic material.
Now we wait on the building inspector to approve the job, and then the new water line will be buried.