Tags

, ,

Today the bulk of the work on our water line replacement was done. The plumbers dug a trench, laid a new water line, disconnected the old and connected the new. Then they turned the water on and checked for leaks.

Digging
Digging

New water line in trench. The new line is a plastic material.
New Water Line in Trench

View of the project.
After Excavation

Now we wait on the building inspector to approve the job, and then the new water line will be buried.

Advertisement